Low-Frequency Noise Control of a Hospital Plant Room:
New Footscray Hospital Case Study
Harvey Law (1) & James Heddle (2)
Download the study Download the presentationThis study is published in the Australian Acoustical Society.
(1) Megasorber Pty Ltd, Melbourne, Australia
(2) Acoustic Consultant, Melbourne, Australia
Abstract
This paper presents an engineering case study of an acoustic design challenge and solution undertaken for the $2 billion New Footscray Hospital project in Melbourne, Australia. A plant room located below noise-sensitive spaces initially had a ceiling sound isolation system design of concrete floor slab with air gap to resiliently suspended plasterboard layers underneath. Removal of the suspended plasterboard layer was requested by the Joint Venture HVAC team due to the difficulty of construction of the hundreds of ceiling suspension points for the plant and equipment through this layer. Analysis of the resulting sound levels in receiver locations without the suspended plasterboard layer indicated a significant reduction in sound isolation performance, with the dBA noise criteria for the rooms above being significantly exceeded, and that the exceedance was largely controlled by the 125 Hz octave band level. The numerous constraints and the acoustic solution developed for this problem are outlined in the paper.
1. Introduction
The recently opened New Footscray Hospital (NFH) was a very large scale, long duration and complex hospital design project undertaken in Melbourne Australia. Figure 1, following, is an elevated northwards looking view of the hospital complex (five buildings) from its southern corner[1].

Figure 1: View of the New Footscray Hospital showing the scale of the project.
Source: VHBA/Misheye
A massive (3,120 m2 floor area) plant room was located on level 3 of the main hospital building, split into two main sections with these having a combined 190 metre long louvred frontage to the building exterior. The plant room sat below spaces in the hospital, such as wards, having noise criteria to be met in the rooms[2]. The noise criteria were to be met for the combined effect of contributions from adjacent rooms, external sources (traffic), and contributions from the plant room via the façade and down duct noise. Upper limits to reverberation times were also criteria to be met in the rooms and these were assumed in calculations. Figure 2 gives a representation of the proximity of the plant room to the patient wards and other rooms above. The project also had to achieve compliance with environmental noise criteria at residential receivers in the vicinity of the hospital.

Figure 2: A representation of the plant room’s proximity to the patient wards.
To control plant room noise to receivers above, the initial design of the plant room ceiling was concrete floor slab (ranging in thickness between 200mm and 300 mm thick with thicker band beam sections) with air gap and resiliently suspended plasterboard layers underneath. Due to the technical difficulty of drilling hundreds of holes through the plasterboard layers to fix hangers from the floor slab, and the sealing of these penetrations, the Joint Venture HVAC team requested if an alternative design solution, without the suspended plasterboard layer, could be achieved.
2. Problem analysis
The approach used for this task was to first quantify the total acoustic octave band sound power levels generated by the plant room sources (all plant operating – worst case), then to estimate the octave band and dBA sound pressure levels resulting in rooms above due to the plant room noise, with the concrete floor slab only, and to compare the results to the dBA room noise criteria[3]. The concrete slab consists of various thicknesses, ranging from 100mm to 300mm, locally thickened with band beams. The sound transmission loss characteristics of the concrete floor slab are shown in Figure 3.

Figure 3: Sound transmission loss of concrete of various thicknesses.
Figure 4 indicates that the estimated A-weighted octave band noise level in receiving rooms was highest in the 125 Hz octave band and the main contributor to the dBA level.

Figure 4: Example resultant A-weighted noise level in a receiving room.
This outcome was due to the combination of the much weaker performance of the concrete at low frequency (region of the coincidence dip, see Figure 3) in combination with the sound power characteristics of the plant room sources, mainly air-handling units (AHUs).
The initial results indicated that the most effective means of achieving the dBA noise criteria in the rooms above would be to reduce the 125Hz band (~60% of the contribution to the dBA level) and the 250Hz band (~32% contribution) sound pressure levels in the plant room. A reduction in these octave bands in the plant sound power (reducing the direct and reverberant levels) and of the reverberant level in the plant room was pursued. Three means of doing this were as follows:
• Reduction of the 125Hz and 250Hz octave band sound power levels of the AHU outside air intakes by changing plant selections. Data on the octave band AHU air intake sound power levels were collated and then ranked by worst offenders. Where possible, the plant selections were tweaked to reduce these octave band levels within all the other AHU performance requirements and constraints. Casing radiation was taken into account in the analysis but had only a minor influence on levels (< 0.5dB).
• Adding outside air intake attenuators to AHUs. Due to space constraints, there were physical limits to the dimension that could be accommodated for these, and an initial target was to try and achieve a 3dB or greater intake attenuation at 125Hz with a maximum length in the order of ~1m (and a bend). The intake level rankings were again used to target and treat the most significant contributors to the total plant room noise level.
• Reduction of the plant room reverberant sound pressure level. Where the reverberant sound field dominates the direct field, the sound pressure level will decrease in proportion to the addition absorption added into the room. The decrease in reverberant sound pressure level, ∆Lp, to be expected in a room for a particular increase in sound-absorption, expressed in terms of the room total absorption, A, may be calculated from ∆Lp =10log10 [Abefore / Aafter] dB, where Abefore is the original total room absorption and Aafter is the total room absorption after the addition of sound-absorbing material. The same result can be obtained by substituting the after to the before reverberation time ratio since Abefore / Aafter = Rtafter / Rtbefore.
As reductions of the plant room items’ total sound power and reverberant sound pressure levels seemed feasible, a target of 30 dBA was set for the receiving room level based on the most sensitive receiving rooms (2dBA below the noise criterion, all plant operating).
To achieve this, goals of a reduction of 3dB or greater in the 125Hz octave band total plant room sound power level and an 8dB reduction in the 125Hz octave band plant room reverberant sound pressure level, via the addition of sound absorption in the plant room, were set. Overall, these measures were expected to achieve a total of 11 dB reduction in the plant room reverberant sound pressure level in the 125Hz octave band.
3. Reduction of the Plant room Reverberant sound level
3.1. Sound Absorption Requirements
Maximizing the increase in absorption in the 125Hz band was constrained by where absorption could be fitted into the plant room, with the ceiling (3,120 m2) being the most practicable surface available. A minimum 125Hz band absorption coefficient target performance of 0.6 was set as the requirement for the absorption treatment[4]; however, as this was a hospital plant room, several other performance requirements also needed to be achieved. The sound-absorbing material was to be installed on the concrete soffit, where stringent fire performance requirements applied. As a minimum, the material needed to achieve an NCC Group 1 fire rating and exhibit no melting or dripping of molten droplets when exposed to fire. The material also needed to be non-fibrous for suitability in a hospital environment.
3.2. Installed Sound Absorption Performance
The plant room octave band reverberation times were measured before and after the installation of the selected complying absorption, Megasorber FM100. Megasorber FM100 has a core material that is a thermoset acoustic foam that is fibre-free and does not melt or drip when exposed to fire, incorporates a non-combustible, airflow-resistant facing, Soundmesh G8, that enhances low-frequency sound absorption, achieving a sound absorption coefficient of 0.60 at 125 Hz, provides thermal insulation of R2.95 and complies with NCC Group 1 fire rating requirements, and so was found to meet all of the design requirements[5]. An illustration of this innovative design is shown in Figure 5.

Figure 5: Illustration of the innovative design of the sound absorption.

Figure 6: One-third octave band absorption coefficients of installed absorption.
Figure 6 shows the one-third octave band absorption coefficients of the absorption (100mm thick) and the relatively high sound absorption in the 125Hz to 250Hz frequency range. A view of the plant room with a bare concrete slab, before the installation of the sound absorption, is shown in Figure 7. The variation of slab thickness and the steps in level, created huge challenges for the installation of the sound-absorbing material. Innovative trims were developed to ensure all the concrete slabs were covered. Figure 8 shows a view after the installation of the sound absorption.

Figure 7: View of the plant room ceiling before the installation of sound absorption.

Figure 8: View of the plant room with sound absorption installed on the ceiling.
The reverberation testing was conducted pre-installation and post-installation. Figure 9, following, shows an example of the setup for reverberation testing[6].
.
Figure 9:Reverberation testing.
The measured results are summarized in Figure 10. The solid lines, dark blue and black lines, are the reverberation time results before and after the acoustic treatment, respectively. Also included in the graph is the estimated reverberation time (dashed blue line) for comparison. It can be seen that there was a substantial reduction in the 125 Hz octave band reverberation time from the untreated condition (blue line) to the treated condition (black line). This reduction was better than initially estimated (estimated prior to the ‘before’ reverberation tests and based on nominal absorption coefficients of a bare plant room).

Figure 10: Treated and untreated plant room octave band reverberation times.
3.3 Estimated Reduction in Plant Room Reverberant Level
The reverberation time reduction result (Figure 9) and expected reduction in the reverberant sound field level were as targeted (8dB in the 125Hz octave band). The octave band reductions in the reverberant sound pressure level in the plant room, estimated from the reduction in reverberation due to the absorption treatment, are given in Table 1.
Table 1: Estimated reduction in plant room reverberant sound pressure level due to treatment
![]()
It would be expected that in combination with the minimum design target 3dB reduction in 125 Hz plant room sound power level, via air intake treatments and plant reselections, that a drop from the estimated 200mm thick concrete room above level of 39dBA, to at or below 30dBA, was achieved (all plant operating). Commissioning tests indicated that the sound pressure levels propagating from the plant room were not a significant contributor to the dBA levels in the rooms above, the room sound pressure levels were primarily controlled by the down duct HVAC contribution. Figure 11 shows the plant room in full operation.

Figure 11: View of completed plant room with sound absorption installed in full operation.
4. Conclusion
An ‘out of the ordinary’ acoustic design challenge, with significant constraints, for a large hospital project was tackled by first identifying the nature of the noise criterion compliance problem (what was driving the exceedance) and then by targeting the most feasible and effective means of achieving the required receiver location sound pressure level reductions for compliance with the project noise criteria.
The final part of the solution was to find a sound absorptive material meeting not only the acoustic but all the other stringent requirements for this hospital setting. Lastly, it is also worth noting that the reduction in plant room sound pressure levels assisted in achieving compliance with noise criteria at residential receivers in the vicinity of the hospital.
ACKNOWLEDGEMENTS
The acoustic design outlined in this paper was undertaken while Author 2 was employed as the NFH Project Lead Acoustics Engineer by Stantec. We thank Stantec and Multiplex for their kind support and cooperation to make this case study possible. NotebookLM was used in the generation of graphic images.
REFERENCES
- Western Health, New Footscray Hospital Project Specific Design Requirements, project document.
- VHBA / Misheye, image source for New Footscray Hospital, subject to permission.
- ISO 717-1:2020, Acoustics — Rating of sound insulation in buildings and of building elements — Part 1: Airborne sound insulation.
- ISO 354:2003, Acoustics — Measurement of sound absorption in a reverberation room.
- Megasorber Pty Ltd, Megasorber FM100 Technical Data Sheet / Test Report.
- ISO 3382-2:2008, Acoustics — Measurement of room acoustic parameters — Part 2: Reverberation time in ordinary rooms.