Hobart Airport is undergoing a major terminal expansion to accommodate growing passenger numbers and improve the overall travel experience. The design team required an acoustic solution that integrated seamlessly with the terminal’s modern architectural aesthetic while delivering reliable sound absorption performance in a high-traffic environment.

The project

Architect: Cox Architecture & Misho + Associates

Installer: Hobart Plaster

Builder: Hutchinson

Location: 6 Hinkler Rd, Cambridge, Tasmania 7170

Download the full case study View the technical data sheet
Challenge

Looking for seamless acoustic integration

Aircraft noise, passenger movement, and large open areas can create excessive reverberation within airport terminals. The architects sought a non-combustible, high-performance acoustic fabric that could be installed discreetly behind perforated plasterboard, providing excellent acoustic control without altering the clean, contemporary ceiling design.

 

Solution

Megasorber G8A-B

Megasorber Soundmesh G8A-B was selected as the acoustic backing fabric for the perforated plasterboard ceiling throughout the area between the security screening zone and the departure gates.

Key benefits of Soundmesh G8A-B for this project include:

  • Non-combustible, meeting stringent fire-safety requirements
  • High acoustic absorption when used behind perforated panels
  • Discreet installation, maintaining the smooth visual lines of the ceiling
Finish

The acoustic upgrade significantly reduces echo and reverberation within the expanded terminal, creating a quieter, more comfortable environment for travellers. Passengers can enjoy a calmer atmosphere after clearing security, enhancing their overall airport experience while preserving the terminal’s sleek architectural character.

Ready to improve the sound clarity in your space?

Contact us to find the right solution for your project.