Hobart Airport is undergoing a major terminal expansion to accommodate growing passenger numbers and improve the overall travel experience. The design team required an acoustic solution that integrated seamlessly with the terminal’s modern architectural aesthetic while delivering reliable sound absorption performance in a high-traffic environment.

The project
Architect: Cox Architecture & Misho + Associates
Installer: Hobart Plaster
Builder: Hutchinson
Location: 6 Hinkler Rd, Cambridge, Tasmania 7170
Challenge
Looking for seamless acoustic integration
Aircraft noise, passenger movement, and large open areas can create excessive reverberation within airport terminals. The architects sought a non-combustible, high-performance acoustic fabric that could be installed discreetly behind perforated plasterboard, providing excellent acoustic control without altering the clean, contemporary ceiling design.
Solution
Megasorber G8A-B
Megasorber Soundmesh G8A-B was selected as the acoustic backing fabric for the perforated plasterboard ceiling throughout the area between the security screening zone and the departure gates.
Key benefits of Soundmesh G8A-B for this project include:
- Non-combustible, meeting stringent fire-safety requirements
- High acoustic absorption when used behind perforated panels
- Discreet installation, maintaining the smooth visual lines of the ceiling
Finish
The acoustic upgrade significantly reduces echo and reverberation within the expanded terminal, creating a quieter, more comfortable environment for travellers. Passengers can enjoy a calmer atmosphere after clearing security, enhancing their overall airport experience while preserving the terminal’s sleek architectural character.
Ready to improve the sound clarity in your space?
