Tackling the Strange Wind Noise on a Commercial Building

Dr. Harvey Law, Chief Engineering Officer, Megasorber Pty Ltd, Melbourne, Australia

Download the study View the presentation

This study is published in the Proceedings of Meetings on Acoustics (POMA).

Abstract – A mysterious noise was reported in a commercial building. This building has multiple levels of car parks with one single level of office space at the top. This top-level is the head office for Renault Australia, located in Mulgrave, Victoria. The office staff at Renault reported a dreadful “howling” noise around the office. It sounded like a huge convoy of trucks thundering past the office, especially worse
on windy days. Specialist engineers, acoustic and wind engineers, were summoned to investigate the root cause of this noise.

The initial investigation revealed that on windy days, the exterior aluminium Z purlin profile cladding created air turbulences, which resulted in this unwanted noise. After conducting tests in the Monash University wind tunnel, various recommendations were suggested and trialled. For example, removing some purlins to reduce the air-flow turbulence, attaching fibre cement sheets to seal the purlins, vibration damping treatment of the Z purlin cladding, and absorptive infill on the metal purlins. This case study presents the analysis of the noise, the results of the various tests and the successful practical resolution.

1 INTRODUCTION

A strange wind-generated noise was reported at a commercial building at 3 Nexus Court in the Nexus Business Park in Mulgrave, Victoria. The building has eight levels of carpark and one level of office space at level nine, which is the head
office of Renault Australia. Levels one to eight inclusive have been clad in Z purlins to provide an aesthetic visual feature and to allow ventilation for the car park levels. The building is shown in Fig. 1.

Figure 1 – The Commercial Building: Nexus Building at Mulgrave, Melbourne.

Renault HQ Office staff complained the noise was random and very annoying, random, worse on windy days and sounded like large trucks hauling through the building. The recorded noise levels are demonstrated in Fig. 2:

Figure 2 – The demonstration of the strange wind noise [Click above image to play video]

The instantaneous noise level time histogram (for one minute) is shown in Fig. 3:

Figure 3 – The noise level time histogram for one minute.

The noise level time histogram for the entire day is shown in Fig. 4. Those noise levels were experienced very frequently when the wind speed was over 10-15 m/s.

Figure 4 – The noise level time histogram for one day.

1.1 Z Purlin Details

The purlin configurations are shown in Fig. 5. The air straight through the gap is 50mm.

Figure 5 – The purlin and the configurations

1.2 Possible Causes of the Noise

The wind passes through the gaps between the purlins and causes turbulence. This turbulence causes air-borne noise. It also causes the purlins to vibrate and rattle.

 

2 ATTEMPTS MADE TO SOLVE THE ISSUE

For the next 12 to 18 months, the builder and several consultants investigated the possible root cause of the noise issue and conducted various tests and trials, as detailed below.

2.1 Wind Tunnel Testing

The wind tunnel was selected as a suitable tool to investigate the possible root cause of this strange noise. The wind tunnel is partially anechoic and allows for accurate measurements in a relatively wind-free corner upwind of the sample. The wind tunnel can generate wind speeds in excess of 150km/hr and has a turntable to allow the incident angle to be changed.

2.2 Test Set-up

A full-sized test rig was installed in the Monash University wind tunnel at their Clayton Campus in Melbourne. The test rig replicated the onsite fixing positions of the Z purlins and was configured to allow extra bracing to be installed.

The distance from the microphone position to the centre of the rig is approximately 4m. Testing was carried out using a Brüel & Kjær 2250 sound level meter measuring 1/3 octave band flat weighted levels. Statistical data and A-weighted levels were also captured. Calibration was carried out at the start and end of every day of testing and showed no significant drift. The wall behind the microphone is located and angled such that no reflective correction needs to be applied to the measured levels.

Testing was conducted over two days together with Mel Consultants who managed the testing process and who also recorded vibration from the purlins using purlin-mounted accelerometers.

Figure 6 – The Test Set-up at the Wind Tunnel – Monash University

The wind incident angles were 0°, ±5° and ±10°. A schematic drawing is shown in Fig. 7.

Incident angle range: -10°to +10°

Figure 7 – A schematic drawing of the wind incident angle

2.3 Measurement Results Summary:

Stage 1 Test: Reduce the vibration level or the rattling of the purlins by stiffening them.

(1) Adding braces – stiffening the purlin panels

  • Existing purlin system
    • Significant vibration
    • Significant noise

The first round of tests revealed that there are significant vibration levels on the purlins. The sound level meter also recorded high noise levels, up to 98 dB(A).

The first attempt is to reduce the rattle of the purlin panels by adding a brace in the middle.

  • Test 1 – Single brace added
    • No significant vibration
    • Significant noise

The measured vibration level of the purlins reduced significantly. However, the sound level meter still recorded a high level of noise.

Based on the above test results, the second brace was added to further stiffen the purlin panels.

  • Test 2 – 2 braces added
    • No significant vibration
    • Significant noise

The measured results revealed that there was very little vibration of the purlins, and there was no rattling of any purlin panels at all.

Summary: adding the braces reduced the vibration and prevented the purlin panels from rattling; however, the significant noise persisted.

Stage 2 test: reducing the air-turbulence-induced noise by changing the flow part or gap.

(2) Remove every 2nd Purlin to increase the air-flow gap:

  • Existing system, ie no braces & every 2nd purlin removed
    • Minor vibration
    • No noise

The measured results revealed a very low level of vibration on purlins, and the noise was gone.

The next two rounds of tests were to check if the brace would cause the air turbulence noise.

  • Test 1: 1 brace (lower) added & every 2nd purlin removed
    • No significant vibration
    • No noise

The addition of one brace did not cause any significant vibration nor additional air-borne noise.

  • Test 2: 2 braces added & every 2nd purlin removed
    • No significant vibration
    • No noise

Adding two braces did not cause any significant vibration of the purlins nor additional air-borne noise.

The above test results revealed that removing every 2nd purlin reduced the purling vibration and eliminated the noise. Based on the above test results, it is evident that wind turbulence is the root cause of the noise issue.

However, removing the purlins creates a non-compliant scenario regarding the Building Code Australia (BCA) in terms of safety concerns therefore, this is unacceptable.

An alternative proposal was proposed to block out the air-flow gaps between purlins using fibre cement sheets. Unfortunately, blocking out all the gaps creates another non-compliant scenario according to the Building Code Australia in terms of the ventilation required for car parking areas.

However, for the purlins located at Level 9, ventilation is not an issue. Therefore, it was decided that a test be carried out at this level. Furthermore, these purlins are the closest to the Level 9 Office and thus contribute the most to the total noise level experienced by the Renault staff.

2.4 Level 9 Purlins Treatment Trial:

Based on the above test results and analysis, Level 9 purlins were fully covered with fibre cement sheets (FCS). This was used to block all the openings between purlins, therefore eliminating the airflow through the purlins. After installation, the fibre cement sheets were painted as shown in Fig. 8.

Figure 8 – Level 9 Purlins were covered with Fibre Cement Sheets and painted black

Unfortunately, both the noise and the noise complaints continued.

2.5 Wind Tunnel Test Results Summary:

Removing every 2nd purlin prevented the purlins from rattling and removed the air-turbulence noise. However, removing the purlins creates a non-compliant scenario regarding the Building Code Australia (BCA); therefore, this was unacceptable.

Blocking the purlin gaps at level 9 did not resolve the noise issue. Blocking out purlin gaps at all other levels would create a non-compliant scenario in terms of the Building Code Australia (BCA) regarding the ventilation requirements.

 

3 MEGASORBER’S APPROACH TO RESOLVING THE ISSUE

The builder and the architect asked Megasorber to provide a noise solution that met the following requirements: (1) No removal of any purlins, (2) Cost-effective and (3) Practical to implement. Megasorber’s approach involved the following steps.

3.1 Proposal

3.1.1 Design Principles

After analysing the wind tunnel test results and the test run on the Level 9 purlins, Megasorber engineers summarised the possible root cause of the strange noise issues as follows:

  1. Significant vibration of the exiting purlins revealed that the purlin panels resonate when the wind is at a certain speed.
  2. Once the excitation force created the resonance, the purlin radiated out and amplified the loud noise.
  3. Furthermore, the wind turbulence creates this air-borne noise.

The team put forward a proposal based on proven soundproofing techniques. Our proposal consisted of two key components:

  1. Damping treatment on the purlins: this was designed to prevent the purlins from rattling by removing the vibration energy from the purlins.
    After detailed modelling and calculation, ‘Megasorber D14’ damping sheets were selected.
  2. Air-turbulence and sound absorption treatment: this was designed to reduce the wind turbulence noise by creating a smooth airflow path. The clever use of a highly absorptive material was also utilised to absorb the air-borne noise.
    After detailed modelling and calculations, ‘Megasorber FM50’ sound absorbing foam was selected.

Fig. 9 shows the clever combination of the D14 damping treatment and the FM50 air-flow treatment.

Figure 9 – The Schematic Drawing of the Treatment Plan

Fig. 10 shows the layout of the acoustic treatment among the purlins.

Figure 10 – A schematic drawing of the acoustic treatments among the purlins

After the detailed modelling and calculations, Megasorber FM50 was to be cut to a precise shape required to optimize the air flow.

(1) The D14 damping treatment details are as follows:

About the damping material: Megasorber D14 is a 2mm thick, self-adhesive vibration-damping sheet, as shown in Fig. 11.

Figure 11 – Megasorber D14: 2mm thick self-adhesive damping sheet

(a) Design target: System Loss Factor: ≥ 0.10, i.e., NR (Noise Reduction) = 20 dB

Reference: Standard: ASTM E756-98: Standard Test Method for Measuring Vibration-Damping Properties of Materials.

Megasorber D14 on 3mm thick aluminium plate:

(b) Design Target: Decay Rate ≥ 20dB / Sec;

Reference: AS1937.10-1977: Determination of Damping Coefficient by The Thick Plate Method (Australian Standard, damping material is applied onto 6mm thick steel plate)

Megasorber D14 on 3mm thick Aluminium plate

(2) The Megasorber FM50 air-flow treatment.

About the material for air-flow treatment and sound absorption: Megasorber FM50, 50mm thick sound absorbing panel with water-repellent, non-combustible Soundmesh G8 facing.

Megasorber FM50 has excellent sound absorption at 250Hz to 2000 Hz and an NRC 1.0.

Fig. 12 shows the sound absorption coefficient over the frequency range for various thicknesses.

Figure 12 – The acoustic performance of Megasorber FM50

Also included in Fig. 12 are the Megasorber FM100 and FM25. Whilst Megasorber FM100 has much higher sound absorption at low frequencies, it was not able to fit inside the fins of the purlins. Megasorber FM25 was determined to be too thin to provide a smooth air flow.

The treatment plan was conducted in two phases. This was done in order to quantify the contribution of each stage of treatment.

Stage 1: The damping treatment implementation: Megasorber D14.

Stage 2: The air-flow treatment implementation: Megasorber FM50 cut-to-shape.

3.1.2 Stage 1: Damping Treatment Design and Implementation Plan

A colour-matched version of the Megasorber D14 sheets was developed to blend in with the aesthetics of the building. Fig. 13 shows the installation of the Megasorber D14 onto the purlins.

Figure 13 – The damping treatment plan of Megasorber D14

The damping treatment was only installed on both sides of the straight sections of the purlins.

3.2 Results

3.2.1 Installation of Megasorber D14, Damping sheets.

Fig. 14 shows the purlins after the implementation of the damping treatment.

  

Figure 14 – Purlins with colour-matched Megasorber D14 installed.

It is evident that the implementation of such damping treatment had very little impact on the aesthetic visual nature of the building’s design.

3.2.2 Demonstration

Once the Megasorber D14 was installed, an on-site ‘tapping’ demonstration was conducted. Please see the demonstration below:

Figure 15 – Demonstration of the damping effect before and after the installation of Megasorber D14 [Click above image to play video]

It is evident that the damping treatment effectively reduced the resonant noise.

 

3.3 Stage 2: Implementation of Megasorber FM50, sound-absorbing material

After the Megasorber D14 vibration damping sheet was applied, the noise level was monitored over the next 6 months. There was no noise complaint, nor any reports of the strange noise.

After the mere installation of Stage 1 only, the Megasorber D14 damping sheets had successfully removed the dominant noise source. There was no need to address the air-flow issue, so the Stage 2 sound-absorbing treatment was deemed unnecessary and therefore abandoned.

 

CONCLUSION

The source of the strange noise was a combination of wind turbulence and purlin vibration or rattling.

The wind tunnel test revealed significant wind noise and vibration of the purlins. The root cause of this dreadful noise was wind turbulence, which caused the excitation of the purlins. These resonating panels of purlins radiated the awful howling noise.

Instead of adding braces, the damping treatment with Megasorber D14 proved more effective. The D14 dissipates the vibration energy from the system, thus preventing the purlins from ratting and radiating the noise. The successful implementation of the vibration-damping treatment eliminated the dominant noise source. It was therefore deemed unnecessary to address the air-flow issue with the sound-absorbing foam.

 

ACKNOWLEDGEMENTS

Megasorber would like to thank Marshall Day Acoustics, Broad Construction Pty Ltd and Salta Properties Pty Ltd for the opportunity to be actively involved in this study and for their permission to publish the test results obtained.

Enhance your office environment with acoustic solutions